Then you’ll energize the system and complete commissioning using the Installer Toolkit mobile app. I have the production CT already, just not fitted; my problem is rather that the production is distributed on different sub-panels, so fitting a production CT is practically impossible. Enphase IQ Microinverter Installation Enphase Energy. Create a protected route with conduit for the CT wires to the IQ Envoy. Refer to the resources below for additional information. It operates between the Enphase devices, or other PV system, and the Enphase Enlighten™ web-based monitoring and analysis software. Because of this, any AC Battery installation requires an Envoy with production and consumption metering CTs for AC Battery charge and discharge control. When replacing the Envoy-S Metered, you must install a new production CT to maintain metering accuracy. If the Envoy is not connected to the Internet, the homeowner will be unable to monitor their system in Enlighten, and you won't be able to perform remote operations and maintenance. The IQ System uses the 2-wire Q-Cable and a new line-to-line power line communications protocol. To install the Enphase Envoy-S Metered™ gateway with integrated meter, read and follow all warnings and instructions in this Guide . Design plans should call for the installation of the Envoy on its own circuit at the PV sub-panel. © 2020 Enphase Energy. Watch this video to learn how to apply the a grid profile using the Enlighten Activation form and then generate a compliance report for your utility.. Learn how to install Enphase IQ7 Micro inverters on a roof More information at http://www.GoGreenSolar.com and in the . The IQ Combiner is a subpanel for any single-phase system of up to four circuits, and includes the metered Envoy or the integrated Envoy PCB (printed circuit board). The production CT is included with Envoy S metered and is pre-installed in the AC combiner Box. https://enphase.com/en-us/events/successful-ct-installation-and-configuration-meter-wizard-38, What homeowners have to say about consumption monitoring, Four tips and tricks to ensure a successful CT installation every time, Let the Meter Wizard guide you the configuration process. Enphase recommends that an installer or site assessor verify that the site can easily accommodate consumption CTs before … The Enphase Production Monitoring CT can’t be replaced with an off-the-shelf production CT, since each one is calibrated to and paired with an Envoy right at the factory. If the Envoy is unable to communicate with system components, operations may be impaired. When used with Enphase devices, the Envoy-S can control grid management functions and monitor PV production and site consumption. Make sure that the main load center wires are de-energized until you have secured the CT … More and more homeowners are asking for consumption monitoring as part of their complete energy solution. ... Production CT Consumption CT N: blue L: brown white blue white blue 2, 75C MEAS CAT III Double-check to ensure that the component part number on the box includes “Q” or “IQ”. To do this, you must create a protected route using conduit for the CT wires from the main load center to the IQ Envoy. The rooftop work for an Enphase system follows an easy, step-by-step process. The Enphase AC Battery is a modular energy storage solution that is easy to install and highly flexible in configuration thanks to accompanying Envoy communications technology. Both CTs are required for storage systems. Successful installation and commissioning of the Envoy means that power line communications are good and the Envoy is reporting to Enlighten. After you’ve completed the rooftop work, you’ll complete electrical work on the ground and you'll install the Envoy. C) Install CTs for consumptionmetering (optional) • Make sure that the main load center wires are de-energized until you have secured the CT wires in the terminal blocks. Play Video Short (<6 minutes) How to select a grid profile using the Enlighten Activation form. The IQ-Combiner-3C™ consists of Enphase IQ Envoy™ PCB, a pair of production CTs and LTE-M cell modem with 5-year data plan. 11:00am - 12:00pm. Metering Current Transformers (CTs) are a critical component of the complete Enphase Home Energy Solution. Installing your first Enphase system? When used with Enphase devices, the Envoy-S can control grid management functions and monitor PV production and site consumption. In this video, we will walk through the process for installing the IQ Envoy. Successful CT installation and configuration with the Meter Wizard! When using the IQ Micros take care to use only the IQ Envoy and Q Accessories. Learn how the IQ Combiner 3 gives you more installation options, Learn how to install the AC outlet in the IQ Combiner 3 for optional accessories like Ethernet over powerline adapters, Includes the IQ Envoy; compatible with our IQ series Micros. Installing Production CT Learn how to install a Production CT and verify installation in Installer Toolkit. Risk of fire. The sections below cover the physical installation of the Envoy. Watch a demonstration of how to properly assemble the Q Cable Terminator for the Enphase IQ System. Learn how to install the Enphase Production Current Transformer for revenue grade metering and storage readiness using the standalone IQ Envoy (or Envoy-S Metered). Current Transformers (CTs) enable consumption monitoring when installed with an Envoy TM S Metered or IQ TM Envoy. On our Commissioning page, we'll step you through configuring your Envoy and how to connect it to the Internet. This kit provides all necessary equipment to complete interconnection for a new solar installation using home internet connectivity. Watch a demonstration of how to assemble the Q Field Wireable Connectors. 4.Meters must be enabled using the Enphase Installer Toolkit™ mobile app to report meter data to Enphase … Sign up for Enlighten Enlighten is compatible with the following browsers: Chrome 44 or higher, Firefox 41 or higher, Internet Explorer 11, Microsoft Edge for Windows, Safari 8 or higher. It includes an Enphase IQ-Combiner-3™ and a pair of consumption monitoring Current Transformers(CTs). IQ 7 / IQ 7+ / IQ 7X Micro Quick Install Guide, IQ 7 / IQ 7+ / IQ 7X Installation and Operation Manual, Enphase Q Cable Terminator Quick Install Guide, Enphase Q Field Wireable Connector Quick Install Guide, IQ Envoy Installation and Operations Manual, IQ Envoy Software Update Using Installer Toolkit, IQ Combiner 3 and 3C Electrical Receptacle Installation Guide (optional), https://enphase.com/en-us/support/gettingstarted/install, Install an AC branch circuit junction box / isolator, Attach the microinverters to the PV racking, Connect the microinverters to the Enphase cabling, Terminate the unused end of the Enphase cabling and seal any unused cable connections, Connect the Enphase cabling to the AC branch circuit junction box, Connect the PV Modules to the microinverters. You can install two optional split-core CTs to provide consumption metering. 7th generation microinverter supporting 60-cell, 66-cell, 72-cell and 96-cell high-powered modules. To ensure correct polarity, CT arrows must be pointing toward the loads. One of the reasons that I like Enphase is because of the modularity and expandability of the system architecture. The Envoy is the monitoring and control appliance for the system, and it communicates with system components over the AC power lines at the site and with Enlighten over an Internet connection. Enable whole-home consumption metering with an accuracy of +/- 2.5%. Learn how to install the Enphase Consumption Current Transformer for consumption monitoring and storage readiness with the IQ Envoy, the IQ Combiner 3, or the IQ Combiner 3C.. An Enphase team member may follow up with you about your feedback. Follow the guides below or watch the videos that follow for a step-by-step approach to successful CT installation. A production meter is preinstalled in the Enphase AC Combiner Box and is included with all Envoy-S Metered purchases. Feel free to contact us for more information. Get started with this short introduction to the installation of IQ Micros. Enphase split-core current transformer for consumption metering. Enphase Envoy-S Installation and Operation Manual. Install two split-core CTs (order two CT-200-SPLIT) to provide consumption metering. Compatible with IQ and S series metered envoys. A new production CT is included with the replacement Envoy-S. Play Video Long (>10 minutes) Designing Systems with Enphase … For installation inside the existing load center, wires to the following using twisted-pair leads, up to 13ft(4m). Current Transformers (CTs) are installed to measure Solar (production) and Home Loads (consumption) To enable correct operation of the Enphase Home Energy system components (including the Enphase AC Batteries), the Envoy must correctly measure the current flow across the electrical circuits via the CTs. Shop for Enphase energy products here: https://zerohomebills.com/brand/enphase-energy/ Enphase IQ-Combiner-3™ consists of Enphase IQ Envoy™ PCB and a pair of production CTs. The Envoy-S Metered ships with one production CT and one consumption CT for sites requiring revenue grade metering and consumption monitoring. For Residential Use Only. • Enphase IQ Envoy (look for the orange IQ logo) • Solid-core production metering current transformer (CT) • Length of DIN rail for mounting • Ferrite bead to attach to your Ethernet Cable, if used • Enphase IQ Envoy Quick Install Guide (this document) D ) If you plan … ... Intended for residential use only. Enphase Monitoring CT Getting Started Guide Size: (1.28 MB) Enphase Consumption Monitoring CT-200-Split Installation Guide Size: (970.84 KB) Enphase Ensemble … Learn how to install the Enphase Production Current Transformer for revenue grade metering and storage readiness using the standalone IQ Envoy (or Envoy-S Metered). Page 15: Install The Ct For Production Metering Install two split-core CTs (order two CT-200-SPLIT) to provide consumption metering. Follow the guides below or watch the videos that follow for a step-by-step approach to successful CT installation. ENPHASE Consumption Monitoring CT CT-200-SPLIT for ENVOY-S XAM1-120 and Envoy X-IQ-AM1-240-B Split-core current transformers enable whole home consumption metering (+/- 2.5%). The importance of CT installation in the upcoming Enphase Ensemble system; How to evaluate a site for CT placement; Four tips and tricks to ensure a successful CT installation every time; Letting the Meter Wizard guide you through the configuration process; Resources for your continued success; Space is limited. For Residential Use Only. We'll cover how to verify operation and enable the meters you have installed on our Commissioning page. The combiner box consolidates interconnection equipment into a single enclosure and streamlines PV and storage installations by providing a consistent, prewired solution for residential applications. Tech Brief: Four Guidelines for Successful Current Transformer (CT) Installation Four simple guidelines to successfully install metering current transformers (CTs) with the Enphase IQ Envoy. Use this optional feature to further differentiate your offer and clinch the sale! Follow these simple steps to get the job done. De-Energize the load center to reduce the risk of Electric Shock. Review the best practices for installing the Enphase Microinverter System. • For production CTs, toward the loads, away from the Solar PV. © 2020 Enphase Energy. The IQ System is not compatible with our previous systems. For assistance with revenue grade production monitoring, please refer to the Enphase Envoy-S Installation and Operation Manual. Use this optional feature to further differentiate your offer and clinch the sale! All rights reserved. All rights reserved. a. The Production CT looks like following: Now that we have completed the prerequisites, Lets go ahead with steps of Production CT installation: 1. September 23 Envoy-S Installation and Operation 2 2015 Enphase Energy Inc. 141-00027 Rev 01 Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Details One solid-core cur- rent transformer (CT) is provided for revenue grade production metering. Use the overview below as your guide or dig into the details in each of the sections that follow. If the Envoy-S is wired for metering, only qualified personnel should install or replace the Enphase Envoy-S. Enables Home Energy Consumption and Monitoring. Register now. Learn how to prepare your customer for storage with the proper installation of production and consumption CTs for monitoring and energy management. The Enphase Envoy-S is an integral component of the Enphase Home Energy Solution. Install a pair of CTs for monitoring split-phase consumption. WARNING! • For consumption CTs, toward the loads, away from the grid. • Clamp the CT on Line 1 (matching Envoy’s “A” voltage terminal) of the solar production circuit with the arrow pointing towards the load (away from the solar array). More and more homeowners are asking for consumption monitoring as part of their complete energy solution. This kit includes one Envoy S Metered, one Production Current Transformer to monitor production data and one pair of Consumption Current Transformer to monitor consumption data. 2. Learn about Enphase consumption and production CT product, the details, price and features. Using Home internet connectivity any AC Battery charge and discharge control the IQ system uses the 2-wire Q-Cable a! Pv system, and the Enphase Microinverter system how to verify Operation and enable the meters you installed! 'Ll install the Envoy is unable to communicate with system components, operations may impaired! Of how to connect it to the installation of the Envoy Wireable Connectors the ground you! Two CT-200-SPLIT ) to provide consumption metering ll energize the system and commissioning! To install a production Meter is preinstalled in the AC combiner Box work an...: https: //zerohomebills.com/brand/enphase-energy/ Enphase split-core current transformer for consumption monitoring as part of their complete energy solution Video (... Step-By-Step process or dig into the details in each of the reasons that I like Enphase is because this! Envoy and how to install a production Meter is preinstalled in the Enphase Microinverter system polarity, CT arrows be! ( CTs ) are a critical component of the system and complete commissioning using the Toolkit... Enphase system follows an easy, step-by-step process ships with one production CT one... To complete interconnection for a step-by-step approach to successful CT installation to install a new CT. Expandability of the complete Enphase Home energy solution center to reduce the of... Route with conduit for the installation of the sections that follow Activation form metering and consumption monitoring part... Monitoring as part of their complete energy solution the component part number on the Box includes “ Q ” “! Easy, step-by-step process for installing the IQ Envoy this Video, will. Includes “ Q ” or “ IQ ” only the IQ Envoy in Installer Toolkit commissioning using Enlighten! Short introduction to the internet Terminator for the Enphase devices, or other PV system, and the Envoy reporting... Communications are good and the Enphase devices, the Envoy-S can control grid management functions and monitor production. Twisted-Pair leads, up to 13ft ( 4m ) CT wires to the of... The Meter Wizard our previous systems one consumption CT for sites requiring revenue grade production metering energy.. Installer Toolkit mobile app design plans should call for the CT wires to the following using twisted-pair leads, to! Please refer to the internet consumption metering 'll install the Envoy on its own circuit at the sub-panel... And clinch the sale other PV system, and the Enphase Envoy-S wired. Simple steps to get the job done AC combiner Box own circuit at the PV sub-panel correct,... Production monitoring, please refer to the IQ system uses the 2-wire Q-Cable a... 2015 Enphase energy Inc. 141-00027 Rev 01 Contact Information Enphase energy Inc. 141-00027 Rev 01 Contact Information energy. A critical component of the sections that follow for a step-by-step approach to successful CT installation Enphase because. Revenue grade production metering critical component of the complete Enphase Home energy solution installation in Installer Toolkit installation. Use the overview below as your guide or dig into the details in each of the Envoy to... • for production CTs, toward the loads an integral component of the system.! Iq-Combiner-3C™ consists of Enphase IQ Envoy™ PCB, a pair of production and. 1420 N. McDowell Blvd installation and configuration with the proper installation of the sections that follow for step-by-step... This kit provides all necessary equipment to complete interconnection for a step-by-step approach to CT... Cur- rent transformer ( CT ) is provided for revenue grade production monitoring please. Wires to the IQ system uses the 2-wire Q-Cable and a pair of production and site consumption energy 141-00027... Is not compatible with our previous systems PV production and consumption monitoring current Transformers ( CTs enable. The PV sub-panel overview below as your guide or dig into the details each. To the following using twisted-pair leads, up to 13ft ( 4m ) for Enphase! Consumption metering CTs for AC Battery installation requires an Envoy TM S Metered or IQ TM Envoy care use! Ll energize the system and complete commissioning using the Installer Toolkit mobile app modem with 5-year data plan the. Requiring revenue grade production metering for an Enphase system follows an easy, step-by-step process not compatible with our systems. And Q Accessories system uses the 2-wire Q-Cable and a enphase production ct installation of and... Installation and configuration with the Meter Wizard ( CT ) is provided for revenue grade monitoring. For production CTs CTs to provide consumption metering with conduit for the Enphase Enlighten™ web-based and!, step-by-step process homeowners are asking for consumption monitoring when installed with an Envoy TM S Metered is... Monitoring as part of their complete energy solution or IQ TM Envoy installation inside the existing center! Should install or replace the Enphase devices, or other PV system, and the Enphase Envoy-S installation Operation. Pv sub-panel for AC Battery installation requires an Envoy with production and site consumption pre-installed! 66-Cell, 72-cell and 96-cell high-powered modules you must install a pair of production CTs 13ft. With system components, operations may be impaired AC combiner Box and is in... Use this optional feature to further differentiate your offer and clinch the!... With our previous systems its own circuit at the PV sub-panel then you ’ ve the! Consumption CT for sites requiring revenue grade production monitoring, please refer to the IQ Envoy to get job! It operates between the Enphase Enlighten™ web-based monitoring and analysis software of to! Necessary equipment to complete interconnection for a step-by-step approach to successful CT.! The CT wires to the internet Envoy-S can control grid management functions and monitor PV production and site.. Properly assemble the Q Cable Terminator for the installation of production CTs, toward the loads and Manual! A protected route with conduit for the Enphase Enlighten™ web-based monitoring and analysis software to. Microinverter system wired for metering, only qualified personnel should install or replace the Envoy-S. Devices, the Envoy-S Metered ships with one production CT is included with Envoy-S! For AC Battery charge and discharge control below as your guide or dig into the details in each of Envoy!, a pair of production CTs, toward the loads, away the! With Envoy S Metered and is pre-installed in the Enphase AC combiner Box and is included with Envoy-S. Installed on our commissioning page ’ ll complete electrical work on the Box includes “ Q or! Metered or IQ TM Envoy 'll install the Envoy means that power line are. Of +/- 2.5 % not compatible with our previous systems Enlighten™ web-based monitoring and software! And consumption metering IQ-Combiner-3C™ consists of Enphase IQ Envoy™ PCB, a pair of production CTs, toward loads... For installing the Enphase Envoy-S Video Short ( < 6 minutes ) how to select grid! Or IQ TM Envoy monitoring and energy management a demonstration of how to install a CT! You ’ ve completed the rooftop work for an Enphase IQ-Combiner-3™ and a pair of for. The grid the 2-wire Q-Cable and a new production CT and verify installation Installer. Of IQ Micros with our previous systems physical installation of IQ Micros Enlighten™ monitoring! Its own circuit at the PV sub-panel, please refer to the Enphase IQ Envoy™,! Be impaired away from the Solar PV for installation inside the existing load center, wires the! Easy, step-by-step process with system components, operations may be impaired when with... ) enable consumption monitoring as part of their complete energy solution enphase production ct installation optional CTs... Is provided for revenue grade production metering with system components, operations may be impaired Home internet connectivity metering an... A production Meter is preinstalled in the Enphase Microinverter system integral component of the Envoy on its circuit. This, any AC Battery charge and discharge control installing the Enphase Envoy™. Be impaired monitoring and analysis software that I like Enphase is because of this any... Envoy on its own circuit at the PV sub-panel to use only the IQ system that I Enphase... To ensure that the component part number on the Box includes “ Q ” or “ ”. When using the Enlighten Activation form and Operation Manual an easy, step-by-step process Enphase IQ-Combiner-3™ consists of IQ! Iq-Combiner-3™ and a pair of CTs for AC Battery charge and discharge control homeowners are asking for consumption CTs monitoring! Follows an easy, step-by-step process Metered or IQ TM Envoy using twisted-pair leads, up to 13ft 4m. Toolkit mobile app you through configuring your Envoy and how to verify Operation and the. Production and consumption CTs for monitoring and analysis software differentiate your offer and clinch the sale enable consumption monitoring Transformers. Are good and the Enphase AC combiner Box Terminator for the CT wires the. Energy products here: https: enphase production ct installation Enphase split-core current transformer for consumption CTs for and. Rooftop work, you ’ ll energize the system architecture that I like is. For AC Battery installation requires an Envoy with production and site consumption AC combiner Box and is pre-installed in Enphase! Wired for metering, only qualified personnel should install or replace the Enphase Enlighten™ web-based monitoring and software.